ProjectHighlights AllConcentrateEngineeringIntegrityLaboratory testOperation and maintenanceProcurementTailingsTechnical Inspection of WorksWaterFeasibility Engineering Canela Aguas del ValleEngineeringWaterFeasibility Engineering for Tailings and Water Management Linga DR 57M Reservoir ExpansionEngineeringTailingsWaterEIA Collahuasi 210 ktpd Seawater Pumping SystemEngineeringWaterEngineering EIA for Existing 7″ Concentrate Pipeline BypassEngineeringPreparation of sectoral permit folders for crossings of ravines and public roadsEngineeringAudit of Operational and Maintenance Management of Concentrate PipelineIntegrityAudit of operational and maintenance management of the concentrate pipelineConcentrateIntegrityEvaluation of the Operational and Maintenance Diagnoses for the Concentrate Transport Systems, Tailings Transport, and Desalinated WaterOperation and maintenanceTailingsWaterPre-Feasibility Level Study of the Rio Blanco Project Slurry PipelineEngineeringDetailed Engineering of CNN PipelinesConcentrateEngineeringLaboratory testRheology Analysis and ReportingConcentrateLaboratory testAnalysis of Scaling in 6/7″ Concentrate Pipeline at MELLaboratory testTechnical Inspection of Works