In 2019, CAP Minería commissioned BRASS to develop detailed engineering for the installation of a steel pipeline coated with HDPE liner to replace the current concentrate pipeline, which was experiencing accelerated wear damage. The new pipeline was to be installed in a common trench with the pipeline which was also undergoing replacement.