In 2015, SAIPEM entrusted BRASS with the development of detailed engineering and procurement support for the seawater boost system as part of the Radomiro Tomic Phase II Sulfide Exploitation Project. This project involved a 48″ diameter steel pipeline spanning approximately 160 km, extending from the discharge flanges of the treated water storage tanks at the desalination plant to the freshwater storage reservoir at the Radomiro Tomic Plant.