In 2016, Minera Centinela commissioned BRASS to conduct an integrity assurance study of the concentrate pipeline from Valve Station 1 (VS1) to the Terminal Dissipation Station (TDS), aiming to identify risks present in the specified sections. This involved analyzing engineering, construction, and operational information of the Concentrate Transport System (CPS).