Project

Concentrate Pipeline Integrity Study for Minera Centinela Phase II

Client

Minera Centinela

Location

Chile

Type of service​

Integrity

In 2016, Minera Centinela commissioned BRASS to conduct an integrity assurance study of the concentrate pipeline from Valve Station 1 (VS1) to the Terminal Dissipation Station (TDS), aiming to identify risks present in the specified sections. This involved analyzing engineering, construction, and operational information of the Concentrate Transport System (CPS).

Fluid type

Concentrate

Pipe lenght

7 KM

Diameter

22″