Feasibility of the tailings transport system
Peru, 2023

BRASS conducted a feasibility study to confirm the technical and operational viability of the system, building on the pre-feasibility engineering work carried out in 2021.

The challenge

BRASS was tasked with identifying the work needed to rehabilitate the tailings transport system and enable the transport of ore in a mixture of gypsum, sand, and reprocessed slurry. 

 

Context

The project is part of an initiative to remove tailings from one of the mining company's tailings ponds, which involved reprocessing, pumping, thickening, and transporting the removed material.

The BRASS Solution

The solution took into account the following: transportation systems involved, via 24-inch pipelines, to transport part of the material to another tank and pulp to the flotation area.

Key aspects of the design carried out

search (1)
Precision Engineering
Evaluation of alternatives: system with two different diameters vs. inclusion of an intermediate booster station.
search (1)
Strategic Evaluation and Decision Making
Detailed focus on the CapEx and OpEx Analysis of the Transportation System.
search (1)
Technical Documentation and Recommendations
Presentation of Class 5 Capital Costs, guaranteeing maximum financial certainty.