Support for mitigation lines and final engineering of the Río Blanco line
Peru, 2024

BRASS carried out a project to support the pipeline infrastructure for a client in Peru's mining sector.

The challenge

Handle the entire process, from baseline surveying to detailed engineering design and technical support. 

Context

The scope included fieldwork to establish baseline data and the development of deliverables that enable the definition of a definitive solution, based on simulations and trade-offs aimed at selecting the highest-performing alternatives.

The BRASS Solution

Definitions of components and associated supports were incorporated, along with supporting technical documentation for subsequent phases. Finally, ongoing support was provided by reviewing external documentation and addressing the client’s inquiries, ensuring technical consistency throughout the development process.

Key aspects of the design carried out

search (1)
Technical Supervision and On-Site Control
Title for projects where quality assurance and direct support in execution were provided.
search (1)
Infrastructure Development and Planning
Title for projects where design, expansion and adaptation of transport systems and/or feasibility studies were carried out.
search (1)
Infrastructure Development and Planning
Deliverables that consolidate findings, actions, and improvement guidelines.

Tell us about your challenge
Let's find the best solution together.