The project, located in Puno, sought to implement a structural fill solution that would allow the exploitation of new reserves and the underground disposal of tailings, aligning with the operational objectives of the San Rafael Mining Unit and the Nazareth Project.
The technical evaluation considered multiple configurations and technologies, starting with five (5) initial alternatives.
Through a multi-criteria analysis (technical, economic, and managerial) and an analysis of cones of influence to optimize the coverage of gravity-fed reservoirs, a hybrid alternative (Alternative 1C) was defined based on the integrated underground filling plant (Alternative 1A) but relocated near the existing San Rafael plant.
From a hydraulic engineering perspective, the analysis determined that there are significant advantages: it reduces operational complexity by requiring only one pumping station, lowers energy consumption, and simplifies the head system. Additionally, cost estimates support this conclusion.



Cookies on this site
We use our own and third-party cookies to keep the site working properly and to understand how it is used. You can accept all of them or keep only the necessary ones.